Introduction to the Six Major Steps in the Manufacturing Process of Water Washing Machines
2025-04-16 11:05:20

How much do you know about the Washing machine while benefiting people's washing life? Below, the washing machine manufacturer will provide a detailed analysis of the manufacturing process of the washing machine equipment:

1. Framework manufacturing steps

The frame and foundation of the washing machine are the first step, which requires a lot of cutting and welding, as well as a large amount of angle iron. The quality of the welding process determines whether the washing machine is reliable enough. As the saying goes, the beginning is difficult, and the frame is also the first step.

2. Manufacturing and installation process of inner cylinder and main shaft

The spindle and inner cylinder of the washing machine are welded together, and the motor drives the spindle to rotate the inner cylinder. When welding the spindle and inner cylinder, it is essential to regularly perform dynamic balance testing, which is a crucial step. The spindle of the washing machine must be made of 45 steel and soaked in lubricating oil at high temperature to prevent thermal expansion and contraction of the spindle in summer and winter.

3. Install shock absorbers, springs, motors, and other accessories

After the frame and inner cylinder of the washing machine are manufactured, the next step is the installation process. First, install the inner cylinder, then install the shock absorber, spring, motor, and finally install the V-belt. After installing these components, proceed to install the inlet pipe, drainage pipe, and steam pipe.

4. Installation of electrical cabinets, steam pipelines, and solenoid valves

After the above processes are completed, it is time for the electrician to take the stage. The electrician is responsible for the manufacturing and installation of the electrical cabinet, the installation of the air pipe and solenoid valve, as well as the installation of the computer version

5. Debugging of Water washing machine

After the installation of the circuit and trachea is completed, the next steps should be debugged. When conducting debugging, electricians need to adjust the fully automatic washing program and manual program of the washing machine. They also need to debug the washing, initial removal, intermediate removal, and high removal programs to see if the equipment runs stably and if there is any water leakage.

6. Install stainless steel panel

Debugging is completed and confirmed to be fine. The next step is to install the stainless steel panel, which needs to be installed on the front, back, left, and right sides. After installation, the entire process is completed.


Comment

(0)
*Captcha:

Copyright © 2025 Taizhou Feilong Machinery Manufacturing Co., Ltd. All rights reserved

This website uses cookies to ensure you get the best experience on our website.

Accept Reject